Trail alerts

Closed Breakneck Ridge station is closed

What to do instead Get off at Cold Spring for the southern trail, Beacon for the northern.

What to do instead Full notice

No trains stop here. Closed April 2025, being rebuilt as part of the Fjord Trail.

active From Mon, Apr 21, 12:00 AM, until further notice Source: Metro-North

← The trail

Trail section

Connector — Marsh Trail Reach (6)

Mile 6.9 – 7.1

Planned

Trail information

ABA §1017.10

Length
0.25 mi · 1299 ft
Surface
Natural earth
Tread width
Not yet decided
Running slope
2.6% typical 7.9% maximum
Where the slope figures come from, and how the section breaks down

An existing trail or route being incorporated into the Fjord Trail. 81.4% of this section is at or below a 5% running slope. About 241 ft is steeper, reaching 7.9% at its worst. Modelled from USGS 3DEP elevation along the traced alignment — not measured on site.

Modelled from USGS 3DEP elevation, sampled every 25 m along the traced alignment. Terrain, not tread.

Slope figures modelled from USGS 3DEP elevation sampled at 25 m along the traced alignment. Terrain estimates, not as-built measurements.

Cross slope
Not yet decided
Step-free
Not assessed — not built
What step-free means here, and why it is not assessed

Nothing on this section has been built, so nothing has been measured on the ground. A step-free answer needs a finished tread, a finished cross slope and a finished surface, and none of the three exists yet.

Walking time
About 7 min
Opens
Fjord Trail North
Assessed
Never — the trail is not built

Traced from FGEIS Figure II-1a — indicative, not survey data.

Elevation

14 to 34 ft

Modelled from USGS 3DEP · not surveyed

How much of this section is modelled at or below a 5% running slope

81.4% of the modelled length sits at or below a 5% running slope. The steepest modelled grade is 7.9%.

  • accessible — 1055 ft
  • ramp equivalent — 241 ft

Where it sits

±15–25 m

The Fjord Trail corridor, Cold Spring to Beacon A schematic map of the Hudson Highlands Fjord Trail corridor between Cold Spring and Beacon, showing Main Trail, Connectors, Meanders, Trailheads. 7.8 miles end to end. The trail list at /map/ carries the same features as text. Proposed Maintenance Facility Dennings Avenue Connector Madam Brett Park
Connector — Marsh Trail Reach (6), drawn heavier, with the corridor around it. Indicative alignment — not survey data. Traced from the published FGEIS figures (January 2026) to about ±15–25 m. The trail is not built and the alignment is not final. Open the interactive map with Main Trail, Connectors, Meanders, Trailheads switched on · Read the same features as a list

Join it at

2 places

6.92

Dennings Avenue Connector (Denning's Point)

Planned
  • P No parking
  • WC Planned
  • TRAIN Beacon 0.9 mi

7.13

Proposed Maintenance Facility

Planned
  • P No parking
  • WC Planned
  • TRAIN Beacon 0.7 mi