Cold Spring to Beacon, New York
The Hudson Highlands, at river level
A 7.5-mile walkable, bikeable, accessible park is being built between Cold Spring and Beacon. No section is open yet.
Sunrise at North Point, Storm King State Park, looking down the fjord. · Juliancolton, via Wikimedia Commons
The Fjord Trail is not built yet. First sections open 2027; the whole trail 2031.
The Fjord Trail will run 7.5 miles along the Hudson's eastern shore, from Cold Spring to Beacon — mostly at grades of 5% or less, shared between people on foot and on bikes, and free to use.
Today
Open. Open now until 8:01 pm (sunset).
The trail in numbers
- 6.8 Miles of mainline
- 2.3 Miles of connectors
- 11 Sections
- 30 Places mapped
Traced from published planning figures · not survey data
The Hudson Highlands
Seven and a half miles between two rail stations, at river level.
Luksus2000, via Wikimedia Commons
Mile 0 · Cold Spring mile 7.8 · Beacon
Along the line
-
Mile 0.8
-
Mile 2.6
-
Mile 6.9
Photographs: Hudson Highlands Fjord Trail (photographer not credited on source)
Coming up
-
Mid-week planting morning
Little Stony Point
-
Eco-Steward work day
Little Stony Point
-
Tide talk at Dockside Park
Dockside Park