Plan your visit · step 2 of 4 · Getting here
Back to how long you haveHow are you getting here?
You have all day. How you arrive changes which routes work, and it decides whether we can name you a return train.
Breakneck Ridge station is closed. It has had no scheduled service since 21 April 2025 and is being rebuilt as part of this project, so Cold Spring and Beacon are the two stations the planner will use. It says so on every route rather than showing you an empty arrivals board.
If this is not working for you
Every route below is also on the trail list, which works with the map switched off. The numbers and how we work them out are on how we calculate this. If something here is wrong, tell us — we would rather fix a slope figure than defend it.
Nothing you choose is stored or sent anywhere. Your answers travel in the address bar, which is also why you can text this page to whoever you are going with.